The Corporate & Commercial Law Society Blog, HNLU

Category: NCLT

  • CIIRP’S MISSING MORATORIUM: A STRUCTURAL FLAW UNDER THE INSOLVENCY AND BANKRUPTCY CODE (AMENDMENT) ACT, 2026

    BY KASHVI SHREY, SECOND – YEAR STUDENT AT CHANAKYA NATIONAL LAW UNIVERSITY, PATNA

    I. Introduction

    The Insolvency and Bankruptcy Code, 2016 (‘IBC’or ‘the Code’) has reshaped India’s approach to insolvency, aiming to strike a balance between creditor recovery and fair treatment of debtors and other stakeholders. At its core, the Code is built on the ideas of value maximisation and equitable, efficient, and transparent processes. In practice, though, the numbers tell a grimmer story. Resolution processes take an average of 602 days, which is nearly double the statutory ceiling of 330 days, and creditors recover roughly 33% of admitted claims. Against this backdrop, the Insolvency and Bankruptcy Code (Amendment) Act, 2026 (‘The Amendment Act’), which received Presidential assent on April 6, 2026, marks a significant shift by introducing the Creditor-Initiated Insolvency Resolution Process (‘CIIRP’) under the newly inserted Chapter IV-A (Sections 58A to 58K) of the Code, as introduced by the Amendment Act.

    The mechanics of CIIRP are relatively straightforward. Section 58B of the amended Code (Initiation of Creditor-Initiated Insolvency Resolution Process) permits a Financial Creditor (‘FC’) belonging to a class notified by the Central Government and holding at least 51% of the financial debt by value to initiate CIIRP by issuing a 30-day notice to the Corporate Debtor (‘CD’). If the default is not resolved within this period, a Resolution Professional (‘RP’) appointed by the initiating creditors makes a public announcement commencing the process. Crucially, the CD’s management is not suspended. It remains in control under a Debtor-in-Possession (‘DIP’) model, subject to the RP’s oversight, with the process running for 150 days, which is extendable up to 45 days.

    The CIIRP, however, contains a structural flaw that undermines these ambitions. Unlike the standard Corporate Insolvency Resolution Process (‘CIRP’), the CIIRP provides no automatic moratorium at commencement. The RP must separately apply to the National Company Law Tribunal (‘NCLT’) for a moratorium after the public announcement of CIIRP, leaving a legally uncovered window during which any creditor may race to the NCLT and trigger a  CIRP petition. Compounding this is the absence of any DIP financing mechanism in Chapter IV-A, leaving management in nominal possession of the enterprise but with no statutory path to working capital.

    II. The Moratorium Gap and the Race-to-CIRP Problem

    The moratorium under the standard CIRP operates as the structural foundation of the entire resolution process. Under Section 14 of the IBC, an automatic stay on suits, enforcement of security interests, asset transfers, and recovery actions against the CD takes effect immediately upon the NCLT’s admission of a petition.  It ensures that all creditors engage the resolution process simultaneously, preventing any single creditor from obtaining preferential recovery by acting ahead of the others.

    The CIIRP departs from this design. Under Chapter IV-A as enacted, the RP makes a public announcement commencing the CIIRP after the requisite 51% creditor approval under Section 58B. A moratorium does not take effect at that point. The RP must subsequently apply to the NCLT for one, and the moratorium takes effect only upon the NCLT’s order. Between the public announcement and the tribunal’s order, the CD’s assets remain exposed and enforcement actions remain available to creditors.

    This gap creates a specific and traceable risk. Section 11 of the IBC, as amended, bars a CD already undergoing CIIRP from being subjected to a fresh CIRP. The bar, however, operates only once the CIIRP is formally underway and a moratorium is in place. A non-notified Financial Creditor, one ineligible to initiate CIIRP because it falls outside the Central Government’s notified class, retains the right to file an application under  Section 7 (Initiation of CIRP by FC) of the IBC once the public announcement is made, but before any moratorium is granted. Under the mandatory admission mechanism introduced by the same Amendment Act, which now compels the NCLT to admit a petition on proof of debt and default within fourteen days of filing, such a petition is likely to be admitted promptly. Once a CIRP commences on admission, the Section 11 bar activates to protect the CIRP, not the CIIRP, displacing the latter entirely.

    The primary argument against this concern is that the Central Government’s notification of eligible CDs and FCs will be drafted carefully enough to manage the risk. This argument, while understandable, misreads the statutory problem. The notification governs who may initiate CIIRP; it says nothing about when the moratorium takes effect. A non-notified creditor holding a valid claim against a notified CD faces no statutory bar to filing a CIRP petition during the moratorium gap. Until  Section 240 (Power of Central Government to Make Rules) of the IBC is exercised to extend moratorium protection to the moment of the public announcement, or until Parliament amends Section 14 to expressly include CIIRP commencement within its scope, this risk is embedded in the statutory text and cannot be managed away by notification design.

    Of particular relevance in this regard is the approach adopted by the United Kingdom through the Corporate Insolvency and Governance Act, 2020 (‘CIGA’). Part A1 of the Insolvency Act, 1986, as introduced by CIGA, provides a free-standing moratorium that takes effect automatically upon filing, without any separate court application, immediately restraining creditor enforcement actions for an initial period of 20 business days. This automatic protection was specifically designed to prevent the kind of creditor race that the CIIRP’s moratorium gap now invites. When enacting Chapter IV-A, Parliament had the benefit of this model; its decision not to replicate an automatic moratorium is a design choice whose consequences require correction.

    III. The DIP Financing Vacuum

    Even if the moratorium gap were addressed, the CIIRP faces a second structural problem. The DIP model at the heart of Chapter IV-A requires the CD’s management to continue operating the enterprise during the 150-day resolution window, and sustaining operations requires working capital. Securing that working capital during an insolvency process, in turn, requires lenders willing to extend fresh credit to a distressed entity.  The empirical backdrop lends urgency to this concern: as per the Insolvency and Bankruptcy Board of India (‘IBBI’) data as of October 2025, over 2,800 CIRPs have ended in liquidation orders, with average creditor recoveries of approximately 6% of admitted claims in liquidation, compared to 32.76% in resolved cases. This differential underscores the premium that early, going‑concern‑preserving intervention commands, and it is precisely that premium which DIP financing is designed to secure.

     Chapter IV-A contains no provision for such financing. There is no statutory basis for granting priority, let alone super-priority, to creditors who extend credit to a CD during an ongoing CIIRP. A commercial lender asked to extend working capital to such a CD faces the prospect of those advances ranking pari passu with pre-petition debt under Section 53 (Distribution of Assets) of the IBC in any subsequent CIRP or liquidation. The Supreme Court in Swiss Ribbons Pvt. Ltd. v. Union of India held that the IBC is a complete code and that priorities under it are statutory, not equitable; courts will not imply a super-priority that Parliament has not enacted. The IBBI committee report of April 2, 2026, which proposed draft CIIRP regulations to operationalise the new Chapter, addresses several procedural details but does not propose a DIP financing mechanism, confirming that this gap remains live and unaddressed in the regulatory framework as currently proposed.

    Of particular relevance here is the approach adopted in Singapore through the Insolvency, Restructuring and Dissolution Act, 2018 (‘IRDA’). Sections 67 and 101 of the IRDA provide that creditors extending rescue financing to a debtor undergoing a scheme of arrangement or judicial management may, upon court authorisation, obtain super-priority over all other claims and administrative expenses in the event of a subsequent liquidation. Singapore’s Parliament thus recognised that the DIP model is commercially inoperative without a statutory financing incentive. The IRDA model is particularly apt for India’s institutional context: unlike the United States Chapter 11 approach, where DIP financing priority is negotiated contractually and is thereafter confirmed by the court, the IRDA conditions priority on prior judicial authorisation a design that preserves creditor oversight and is structurally consonant with the CoC-centred governance architecture already established under the IBC.

    IV. Corrective Prescriptions for Subordinate Legislation

    These gaps are correctable through subordinate legislation before the Amendment Act is brought into force, provided the IBBI and Central Government approach them as structural corrections rather than optional refinements.

    The first and most urgent correction is to extend moratorium protection to the moment of the RP’s public announcement of CIIRP commencement. The Central Government holds rule-making power under Section 240 of the IBC and the IBBI holds regulation-making power under Section 240A (Power of Board to Make Regulations); either authority could be deployed to prescribe an interim stay, co-extensive in scope with Section 14, taking effect from the date of the public announcement and operates until the NCLT’s formal order. The UK’s automatic Part A1 moratorium under CIGA demonstrates that an immediate, filing-triggered stay need not require judicial pre-authorisation to be effective; India’s subordinate legislation can replicate that outcome within the existing statutory architecture. The more durable solution is a Parliamentary amendment expressly bringing CIIRP commencement within Section 14’s automatic moratorium, and the IBBI’s ongoing regulatory process presents the appropriate occasion to recommend this to the Ministry of Corporate Affairs.

    The second correction is the introduction of a CIIRP-specific interim financing provision. The IBBI’s draft regulations should prescribe that advances extended to a CD during an ongoing CIIRP by any lender, whether or not a member of the Committee of Creditors (‘CoC’), shall, upon approval by at least 66% of the CoC by value and NCLT sanction, rank as priority claims ahead of pre-petition unsecured debt in any subsequent CIRP or liquidation. This voting threshold mirrors the one prescribed for approval of CIIRP resolution plans, ensuring that the same majority empowered to approve the ultimate resolution also authorises interim financing on priority terms. Further reinforcing this design, the Singapore model, court-authorised super-priority under Sections 67 and 101 of the IRDA, demonstrates that such a mechanism can be operationalised through regulations requiring NCLT approval as a condition precedent, preserving judicial oversight while creating the commercial certainty that lenders require.

    Lastly, the notification of eligible FCs must extend CIIRP initiation rights to Asset Reconstruction Companies (‘ARCs’) registered under the Securitisation and Reconstruction of Financial Assets and Enforcement of Security Interest Act, 2002 (‘SARFAESI Act’) and to distressed debt funds that have acquired financial debt through assignment in the secondary market. Confining the notification to scheduled commercial banks would create a sub-classification within the class of financial creditors based on the mode of acquisition rather than the economic character of the claim. The analysis in Swiss Ribbons Pvt. Ltd. v. Union of India, which upheld the financial-operational creditor distinction on the ground that the two classes are intelligibly differentiable in their commercial roles, does not support a further sub-classification within financial creditors that tracks institutional form rather than economic function.

    V. Conclusion

    The CIIRP is the most structurally innovative provision the IBC has seen since its enactment in 2016. The DIP model, the compressed 150-day timeline, and the out-of-court initiation framework, each represent genuine advances over the CIRP’s tribunal-dependent architecture. These advances, however, are contingent on scaffolding that the Amendment Act does not presently provide. The absence of an automatic moratorium at CIIRP commencement creates a race-to-CIRP process vulnerability that can collapse the framework before any resolution plan is formulated. The absence of a DIP financing mechanism reduces incumbent management’s role to a formality, depriving the CIIRP of the going-concern preservation it is designed to achieve.

    Accordingly, before the Central Government notifies the commencement date for the Amendment Act, the IBBI’s subordinate legislation must incorporate three targeted corrections: an automatic interim stay operative from the date of the public announcement, on the lines of the UK’s Part A1 moratorium; a CoC-approvable and NCLT-sanctioned priority mechanism for fresh credit, on the lines of Sections 67 and 101 of Singapore’s IRDA; and an FC notification that includes ARCs and  holders of assigned financial debt. Without these corrections, the CIIRP will generate the contested, tribunal-heavy litigation it was specifically designed to avoid.

  • Decoding Residuary Jurisdiction: Why NCLT cannot release PMLA Attachments

    Decoding Residuary Jurisdiction: Why NCLT cannot release PMLA Attachments

    RITURAJ KUMAR , FIFTH – YEAR STUDENT AT RMLNLU, LUCKNOW

    INTRODUCTION

    The interplay of the Insolvency and Bankruptcy Code, 2016 (‘IBC’) and the Prevention of Money Laundering Act, 2002 (‘PMLA’) has been an issue of deliberation since the introduction of the IBC. The conflict is quite natural as both statutes have a non-obstante clause suggesting each has an overriding effect. This leads to a situation where both statutes claim primacy in case of conflict. Further, they both have divergent objects. The IBC aims to maximise the asset during the Corporate Insolvency Resolution Process (‘Resolution Process’), whereas the PMLA provides for confiscating assets arising from or engaged in money laundering. This becomes a significant barrier during the resolution process.

    The discussion around the primacy of the statute and whether a moratorium imposed under Section 14 of the IBC would extend to the attachment made by the Enforcement Directorate (‘ED’) under Section 5 of the PMLA has been a concern for almost a decade.  This blog does not delve into the above issue and restricts its scope to why the National Company Law Tribunal(‘NCLT’) cannot release attachments of a corporate debtor confirmed by the Adjudicating Authority under the PMLA. The National Company Law Appellate Tribunal (‘NCLAT’) in Anil Goel for Dunar Foods v. ED recently affirmed this position that the NCLT cannot release such attachments. However, the legal position on this issue remains unsettled as the Bombay High Court in Shivcharan v. Adjudicating Authority and Anr (‘Shivcharan’) had previously authorised the NCLT to release such attachments while exercising its residuary jurisdiction. Currently, the Shivcharan judgement is pending before the Supreme Court of India for final determination of this issue. In this light, this blog examines the residuary jurisdiction provided under the IBC and argues how Shivcharan judgement disregards the established legal principle and procedure in an attempt to achieve the objects of the IBC.

    RESIDUARY JURISDICTION OF THE NCLT

    Residuary jurisdiction has been vested in the NCLT under Section 60(5)(c) of the IBC. However, it is limited to deciding matters related to the resolution or liquidation of the Corporate Debtor, and it does not provide an inherent jurisdiction. This aligns with the Embassy Property Developments Pvt. Ltd. V. State of Karnataka and Ors case, where the Supreme Court of India asserted that the NCLT cannot replace the legitimate jurisdiction of other courts or tribunals when the issue does not arise solely from or relate to the insolvency of the corporate debtor. By extension, this would equally apply to a special statute like the PMLA where the attachment was confirmed by the Adjudicating Authority under Section 8(3) of the PMLA.

    The attachment under the PMLA relates to the ‘proceeds of crime’ derived from the criminal activities associated with the scheduled offences. These crimes threaten the integrity of the financial system and affects the public at large. These offences are prosecuted by the state and are in the realm of public law. The PMLA was introduced to fulfil India’s international commitment to combat money laundering, aligning with the Vienna Convention (1988) and the United Nations Convention against Transnational Organised Crime (2000).  Such matter, being in the realm of public law, cannot be brought within the phrase “arising out of or in relation to the insolvency resolution” as enshrined under the aforementioned section.

    This position has been recently reaffirmed in Kalyani Transco v. M/s Bhushan Power and Steel Ltd. , where the division bench of the Supreme Court held that the NCLT or NCLAT does not have any authority to adjudicate upon a public law like PMLA. The NCLT, deriving its jurisdiction from the provisions of the IBC and constituted under the Companies Act 2013, is a coram non judice to direct the ED to release the attachment. 

    NCLT AUTHORITY DURING THE RESOLUTION PROCESS 

    During the resolution process, the primary duty of a Resolution Professional is to run the Corporate Debtor as a going concern.Recently, in the case of Mr Shailendra Singh, Resolution Professional of Foxdom Technologies Pvt Ltd V. Directorate of Enforcement & Anr, the Resolution Professional invoked the residuary jurisdiction to defreeze the account of the Corporate Debtor, which was frozen by the Adjudicating Authority under PMLA. The NCLT held that they do not have the power to issue directions to the ED in this regard. It reiterated the stance adopted by the NCLAT in Kiran Shah v. Enforcement Directorate Kolkata that the jurisdiction to deal with matters related to attachment and freezing of accounts under PMLA vests exclusively with the authorities designated under the PMLA. If aggrieved by any action, the Resolution Professional can seek appropriate remedies under the PMLA itself. The statute provides adequate mechanisms for resolving concerns and claims. This clear demarcation of jurisdiction ensures that the PMLA remains independent of IBC and serves its legislative object.

    NCLT AUTHORITY AFTER APPROVAL OF THE RESOLUTION PLAN 

    While the forum for releasing attachments during the resolution process is relatively clear, the situation becomes complicated after approval of the resolution plan under Section 32A of the IBC  It states that the Corporate Debtor cannot be held liable for the prior offence committed by the erstwhile promoter, and protects the property from being attached.

    In Shivcharan judgement, the Bombay High Court reinforced this interpretation that after approval of the resolution plan, the Adjudicating Authority under the PMLA must release the attachments. It also stated that this is the only means of ensuring that the right, as stipulated in Section 32A of the IBC, will start to flow. This position is supported by the Supreme Court’s decision in Manish Kumar v. Union of India which upheld the constitutionality of Section 32A. Article 141 of the Constitution of India ensures consistency in the interpretation of law and set a judicial precedent where all lower courts follow the ruling made by the Supreme Court of India. Consequently, the PMLA Court is bound to comply and give effect to the Section 32A by releasing the attachment.

    However, the Shivcharan judgement erred in empowering the NCLT to release the attached property made under the PMLA under the residuary jurisdiction. The Bombay HC read something not expressly provided in the law and authorised NCLT to adjudicate upon the issue falling into the purview of another court. Though this judgment seeks to achieve the object of the IBC, it overlooks the relevant precedents and established principles. Notably, it stands in aberration with the Gujarat Urja Vikas Nigam Ltd. v. Amit Gupta, where the Supreme Court issued a note of caution to NCLT while exercising the residuary jurisdiction. The Apex Court noted that the NCLT has jurisdiction to adjudicate disputes that arise solely from or relate to the insolvency of the corporate debtor. It has to ensure that they do not usurp the legitimate jurisdiction of other courts or tribunals when the issue extends beyond the insolvency of the corporate debtor.

    Additionally, this approach is also in conflict with the principle of harmonious construction, which is applied to reconcile conflicting provisions within a statute or two different statutes. A harmonious construction cannot extend to the limit which renders one provision completely redundant. The Shivcharan judgement makes the provisions of the PMLA nugatory by bypassing the PMLA courts, and authorises the NCLT to release the attachment.

    Moreover, allowing the NCLT to discharge the attachment practically implies that the NCLT is sitting in an appeal against the Adjudicating Authority of the PMLA, where the latter confirmed the attachment made by the ED.  This goes against the settled principle that the forum to hear the appeal is to be tested in reference to the forum which passed the original order. Since the attachments are confirmed under Section 8(3) of the PMLA by its Adjudicating Authority, it must be discharged either by the same forum or by the appellate forum under Section 26 of the PMLA constituted thereunder. In short, the Adjudicating Authority under the IBC i.e. NCLT cannot assume the role of Adjudicating Authority under the PMLA.

    A WAY AHEAD

    As the appeal of the Shivcharan judgement and related cases are pending before the Supreme Court, a clear jurisdictional boundary must be established by a conclusive ruling. The authority to discharge attached property must rest with the PMLA Court unless a legislative amendment says otherwise. The PMLA Court is a competent forum authorised by the law to deal with attachment and permitting the NCLT to adjudicate on such matters only causes jurisdictional conflict and confusion among the litigators, forcing them to move from one court to another.

    However, while adopting this approach, Section 32A of IBC must be given effect. This provision represents the last expression of the intent of the legislature, as it was introduced through an amendment in 2020. After approval of the resolution plan, the PMLA court must be mandated to release the attachment. This ensures that the protection under the said provision can take effect, and the Successful Resolution Applicant is not made liable for the prior offence. For Section 32A to operate effectively, the perquisite prescribed therein must be satisfied, namely that the new management is not related to the prior management and is not involved in the alleged offence. In practice, the PMLA Court often encounters difficulties in determining compliance with these requirements while considering the release of attachments. To address this issue, the NCLT may issue a No Objection Certificate (‘NOC’) while approving a resolution plan, specifying that the statutory conditions of Section 32A are met. Such an NOC will affirm that a promoter is not regainingcontrol or laundering assets through the resolution process. It will prevent jurisdictional conflict and will not cause unnecessary hardships to litigating parties. In effect, this will ensure that resolution applicants are not discouraged, and revival of a corporate debtor is not obstructed.     

    This conflict between the IBC and the PMLA reflect the difficulty of reconciling two statutes having divergent objects and non-obstante clause. To maintain the independence of both statutes, a consistent position has to be adopted defining a clear jurisdictional boundary ensuring the revival of a corporate debtor is not discouraged. A conclusive ruling by the Supreme Court in this regard or an appropriate legislative amendment is essential to resolve this conflict and bring much-needed clarity to relevant stakeholders.

  • NCLT’s Departure: Reviving Time-Barred Claims in Insolvency Proceedings

    NCLT’s Departure: Reviving Time-Barred Claims in Insolvency Proceedings

    By Navya Bassi and Rhythm Goel, fourth-year students at NLU, Odisha
  • Determination of the Status of A Creditor: Artificial Wisdom of the Committee of Creditors

    Determination of the Status of A Creditor: Artificial Wisdom of the Committee of Creditors

    A 4-minute read by Arihant Jain, a fourth-year student of Nirma University

    The National Company Law Appellate Tribunal (‘NCLAT’) on 18.12.20 in the case of Rajnish Jain v. BVN Traders and ors (‘Rajnish Jain’)held that the Committee of Creditors (‘CoC’) constituted under Section 21 of the Insolvency and Bankruptcy IBC, 2016 (‘IBC’) cannot determine the status of a creditor as a financial or an operational creditor. It is a matter of applying insolvency law to the facts of each case. The judgment clarified that only the adjudicating authority has power to adjudicate the status of a creditor as a financial or an operational creditor. The author hereinafter highlights the judiciousness of the Rajnish Jain judgment in the light of the principle of equality of similarly situated creditors, commercial wisdom of the CoC & limited rights of the CoC under the IBC.

    Factual Background

    The National Company Law Tribunal, Allahabad (‘NCLT’) admitted an application under Section 9 of the IBC to initiate Corporate Insolvency Resolution Process (‘CIRP’) against the corporate debtor, Jain Mfg (India) Pvt. Ltd. BVN Traders,the Respondent in this case had extended a loan of Rs. 80,00,000 to the corporate debtor having a secured title deed of the property of corporate debtor against the consideration of 18% per annum. BVN Traders had filed FORM C as financial creditors and the insolvency resolution professional (‘IRP’) admitted the claim of BVN Traders as a financial creditor.

    Rajnish Jain, the promoter, stakeholder and managing director of the corporate debtor, filed an application for removal of BVN Traders from the status of financial creditor. The NCLT directed the resolution professional (‘RP’) of the corporate debtor to seek approval from the CoC to change the status of BVN traders from financial creditor. Pursuant to this, the CoC passed a resolution that BVN Traders is to be treated as financial creditors.  In light of this resolution, the NCLT rejected the claim of the promoter via order dated 23.01.20.

    Subsequently, in the 7th meeting of CoC, the RP again proposed the agenda to determine status of BVN Traders. The CoC passed a resolution with its majority that BVN Traders is not a financial creditor. The CoC also discussed the agenda regarding withdrawal of CIRP under Section 12A of the IBC and for the same, prior approval of 90% majority of voting shares of CoC is required. However, the withdrawal resolution did not attain the 90% majority and the same was not passed. In the 8th meeting of the CoC, withdrawal of CIRP process was again discussed and the same was passed by CoC without including BVN Traders in the CoC. An appeal was filed by Rajnish Jain against the order dated 23.01.20 of the NCLT.

    Decision of the NCLAT:

    The NCLAT observed that the CoC cannot determine the status of creditor. It is a matter of applying the applying the IBC laws to facts. It further held that CoC cannot use its commercial wisdom to determine the status of creditor. The NCLAT observed that despite the order being passed by the NCLT, the CoC proceeded to change its earlier stance and passed a resolution contrary to NCLT order, thereby undermining its authority. The NCLAT also held that the resolution passed in the 8th meeting was bad in law since it was passed after illegally reconstituting the CoC. 

    Current Position of Law 

    Financial creditor and Operational creditor are defined under Sections 5(7) and 5(20) of the IBC. Pertinently, the Supreme Court’s judgment in the case of Swiss Ribbons Pvt. Ltd v.UOI differentiated both the terms by relying on the recommendation of  BLRC Report, 2015:

    “Financial creditors are those whose relationship with the entity is a pure financial contract, such as a loan or a debt security. Operational creditors are those whose liability from the entity comes from a transaction on operations.”

    Further, in Pioneer Urban Land and Infrastructure Ltd and ors v. UOI, the Apex Court observed that financial creditors owe financial debt to meet the working capital or requirement of corporate debtor. On the other hand, operational creditors provide goods and service to the corporate person. In the instant case, the loan extended to corporate debtor is a pure financial contract to meet the working requirement. Therefore, the NCLAT has rightly denied the arbitrary decision of CoC in determining the status of creditor.

    Analysis

    • Principle of Equality – Similarly situated creditors should be treated alike

    Article 14 of Constitution of India provides that equals should be treated equally and unequal should be treated unequally. Further, in CoC of Essar Steel Limited through Authorised Signatory v. Satish Kumar Gupta and ors.the Apex Court observed that similarly situated creditors should be treated equally. Empowering the CoC to determine the status of a creditor will create inequality amongst the same class of creditors as other creditors of the CoC would determine the status of a creditor of the CoC who is in pari passu with them. In the instant case, the NCLT failed to consider the principle of equality by authorizing the CoC to determine the status of BVN Traders.

    • Commercial wisdom of the CoC – Not an absolute power

    Commercial wisdom of the CoC is not an absolute power. The Apex Court in CoC of Essar Steel Limited through Authorised Signatory v. Satish Kumar Gupta and ors has observed that commercial wisdom must be in consonance with the basic aims and objectives of IBC.  Decision of the CoC is subject to checks and balances of the IBC. In Swiss Ribbons Pvt Ltd. v. UOI, the Supreme Court has observed that the primary objective of the IBC is to balance the interests of all stakeholders. Under the IBC, an aggrieved person has the authority to challenge the constitution of CoC or categorization of creditors before the adjudicating authority. In the instant case, reclassifying the status of creditor by CoC is beyond the scope of commercial wisdom since it is in the hands of adjudicating authority to adjudicate the claims of categorization of creditors. Under Section 61(1) of the IBC, aggrieved party may challenge the order passed by NCLT before the NCLAT. However, in the instant case, the CoC sat in the position of NCLAT and gave a resolution contrary to the order passed the NCLT, which is beyond the aims and objectives of the IBC.

    •  The IBC is a complete code in itself

    Section 28(1) of the IBC which enumerates the conditions where prior approval of the CoC is required does not provide for seeking it for the determination of the status of a creditor during CIRP. Moreover, no provision under the IBC empowers the CoC to determine the status of a creditor. It is also pertinent to mention that the IBC is complete in itself. It has unambiguously laid down the powers of the CoC. 

    Further, an aggrieved party dissatisfied with the status of a creditor can submit an application to the NCLT through RP with the approval of 90% voting share of the CoC for the withdrawal of CIRP. However, in the 7th meeting of CoC in the instant case, only 66% of the CoC approved the withdrawal of CIRP. Further, a financial creditor, being a part of the CoC, cannot be excluded from taking part in the voting process of withdrawal of CIRP process. It would be violation of legal right of creditor of CoC mentioned under Section 12A of IBC.  However, in the 8th meeting of the CoC in the instant case, BVN Traders was not allowed to vote for the withdrawal of CIRP. Hence, the legal right of BVN Traders to vote under Section 12A is being defeated. 

    Judgment of Adjudicating Authority: It is a matter of applying law to the facts of each case    

     It is pertinent to mention that it is the statutory duty of court to deliver any judgment based upon the law. For clarifications, the court has the authority to take the opinion of experts. However, the judgment cannot be based solely on the expert opinion. The judgment has to be delivered by applying the law to the facts. In the instant case, the NCLT had delivered its judgment based solely on the decision of the CoC, however, the status of a creditor needs to be determined by the NCLT by applying the IBC to the facts of each case. The NCLAT has rightly clarified that the status of creditor could be determined only by applying the IBC to the facts of each case. 

    Conclusion

    The NCLAT has rightly adjudicated the matter by removing the flaws of NCLT’s decision which   would have led toimbalance by going against the purpose of commercial wisdom of the CoC. CIRP being the collective resolution process seeks parity amongst similarly situated creditors. Preference cannot be given to any similarly situated creditors. The adjudicating authority, by not providing legal reasoning for empowering the CoC to determine the status of creditor failed to consider that legal reasoning is the core of any judgment. The NCLAT has rightly adjudicated that empowering the CoC with such rights would have completely disabled the intent and purpose of the CIRP under the IBC.