The Corporate & Commercial Law Society Blog, HNLU

Tag: Arbitration

  • Term Sheets and their Status in India: Key Lessons from the Oyo-Zostel Dispute

    Term Sheets and their Status in India: Key Lessons from the Oyo-Zostel Dispute

    ADITYA GANDHI AND SIDDHARTH SHARMA, FOURTH- YEAR STUDENT AT NLUO, ORISSA

    INTRODUCTION

    Term Sheets are preliminary agreements executed at the first stage of complex commercial transactions between companies and prospective investors. These agreements outline the deal structure and cover the material terms and conditions of an investment. They largely serve as non-binding agreements to direct negotiations between the investors and the target. While the core commercial terms in a term sheet are intended to be non-binding, virtually all term sheets contain certain clauses like exclusivity and confidentiality, that are binding and legally enforceable. This creates an uncertainty as to whether a “non-binding” term sheet could crystallize into a set of binding rights and obligations.

    In this context, the recent Delhi High Court (‘Delhi HC’) judgement in Oravel Stays Private Limited v. Zostel Hospitality Private Limited has highlighted the question regarding the legal enforceability of term sheets. The Delhi HC quashed the arbitral award that held the term sheet signed between Oyo and Zostel to be binding in Zostel’s favour. The dispute, spanning nearly a decade, seems to have concluded with Zostel withdrawing their special leave petition before the Supreme Court in July 2025.

    In light of this judgement, the article aims to map out the impact that the Delhi HC judgement will have on the status of term sheets. The authors explore the key difference in the rationale of the aforementioned judgement and the arbitral award.

    FACTUAL BACKGROUND

    This dispute stemmed from a proposed acquisition that fell through. Oyo and Zostel had executed a term sheet in 2015, where Oyo offered to purchase certain assets from Zostel. In line with the conventional approach, the term sheet’s preamble mentioned that it was non-binding and subject to definitive agreements. The proposed acquisition did not materialise after differences emerged between the parties before definitive agreements could be signed. Zostel claimed it had completed its obligations under the term sheet and sought for the specific performance of reciprocal obligations. Oyo contended that without any definitive agreements, it had no obligations towards Zostel as the term sheet was non-binding.

    THE ARBITRAL AWARD IN FAVOUR OF TERM SHEET ENFORCEABILITY

    The Arbitral Tribunal held that the term sheet had become binding due to the conduct of the parties. It observed that Zostel’s performance of its obligations under the term sheet gave them a legitimate expectation from Oyo to fulfil reciprocal obligations. The Tribunal further observed that Oyo’s communications to Zostel indicated that the parties were acting upon the term sheet. The Tribunal further held that the transaction envisaged in the term sheet was not consummated due to Zostel’s performance of their obligations; and there was no consensus ad idem between the parties. However, the Tribunal stopped short of granting the relief of specific performance to Zostel. Instead, it held that Zostel was entitled to bring a claim for specific performance of the term sheet in the absence of any definitive agreements.

    The Tribunal’s award marked a significant deviation from the standard legal position on the enforceability of term sheets. This approach by the Tribunal considered the actual intent and performance of the parties over mere contractual terminology. To put things into perspective, Oyo had acquired control over the business assets of Zostel after singing the term sheet. Further, the Tribunal observed that Zostel had satisfied all the conditions laid out in the ‘closing’ clause of the Term Sheet; and that the closing of the transaction (Oyo acquiring Zostel) was the only outcome after compliance with the stipulated conditions. Following this reasoning, the Tribunal held that the Term Sheet had become a binding document due to the actions of the parties.

    THE DELHI HC RULING

    The Delhi HC set aside the arbitral award rendered in favour of Zostel for being inconsistent with the public policy of India. The Court observed that the conclusions drawn in the award were at odds with the express language of the term sheet, wherein it stated that it is non-binding except for five specifically delineated clauses. It noted that had it been the intention of the parties that all the provisions of the term sheet be made binding, there would have been no occasion to incorporate an express stipulation to the contrary.

    The Court placed reliance on the Karnataka High Court judgement in Azeem Infinite Dwelling v. Patel Engineering Ltd. (‘Azeem Infinite’), which held that term sheets cannot be considered as binding agreements if they require the execution of definite agreements. It underscored that the term sheet was a preliminary document, the binding nature of which was subject to the execution of definitive agreements pertaining to its subject matter. It further observed that the arbitral tribunal did not hold that any implied term must be read into the term sheet to render it binding; rather, it anchored its finding of the binding nature of the term sheet on the conduct of the parties.

    The court’s view supported the strict interpretation of contractual terms, holding that the intention of the parties must be ascertained from the words used and not from the subsequent conduct of the parties. The Court also remarked that the award itself acknowledged the absence of definitive agreements, which was attributed to unresolved issues with a minority investor. There was no consensus ad idem between the parties, since the definitive agreements as envisaged under the term sheet were never executed.

    The Delhi HC also emphasised on the nature of a term sheet as a determinable contract; i.e. a contract whose outcome can be decided unilaterally by the ‘sweet will’ of one party without assigning any reasons for the same. This observation of term sheets being determinable contracts further weakens the case for their enforceability, emphasising that they are usually non-binding unless explicitly mentioned otherwise.

    INTERPRETATION UNDER CONTRACT LAW

    For any agreement to constitute a binding contract, the intention of the parties to create legally binding relations becomes the primary consideration. Indian courts have inferred the intention of parties not just through express written terms of the agreement, but also through their conduct. The Supreme Court (‘SC’) in Transmission Corpn. of Andhra Pradesh Ltd. v. GMR Vemagiri Power Generation Ltd. held that the conduct of parties, along with the surrounding facts, is relevant in determining if a binding agreement exists in the absence of express written terms. In this dispute, the Tribunal went a step further by holding the term sheet to be binding due to the conduct of parties, despite the preamble clearly stating otherwise.

    Though the Delhi HC found the Tribunal’s reliance on conduct to be precarious, it stopped short of going into the merits of the Award. The SC’s judgement in Bank of India v. K Mohandas, where it observed that contracts must be interpreted from their text, and not subsequent conduct of parties, offers support to the Delhi HC’s concerns. There is a clear conflict with regards to whether subsequent conduct should be considered to decide whether an agreement is binding. The precedent in Azeem Infinite supports the premise that term sheets requiring execution of definitive agreements are not binding. That said , there isn’t any definitive precedent on this issue. As a result, there still remains a sufficient legal basis for term sheets to be held binding in future decisions.

    Ultimately, the conflict between strict textual interpretation against reliance on subsequent conduct of the parties to infer a binding contract creates uncertainty for parties. The inconsistent precedents on this issue leave a significant ambiguity as to if, and when a term sheet becomes binding.

    WAY FORWARD

    Term sheets show the intention of parties to negotiate and subsequently reach an agreement. They do not represent consensus ad idem between the parties. The Delhi HC’s judgement is likely to become the binding precedent on this issue. However, the Award, backed by previous jurisprudence and no settled position, shows that there still is a possibility of courts holding term sheets to be binding in the future. This dispute has emphasised on the importance of term sheets to be well drafted and watertight to safeguard the interests of the parties.

    The buyers must  ensure that they are not held liable for breach of contract if a transaction falls through despite the term sheet being signed. Adding a final confirmation of closing from the buyer to the Closing clause can prevent the buyer from any liability. This adds an extra safeguard, ensuring that the buyer is not held implicitly responsible for breach of contract, especially when a term sheet is not even a binding agreement. A well-drafted termination clause can permit the buyer to terminate if the due diligence findings are unsatisfactory. At the same time, it can also allow the seller to withdraw if they believe the deal won’t conclude. The sellers need to avoid a situation where if a transaction falls through, their performance of obligations under the term sheet should not be rendered meaningless. To prevent this, sellers can seek indemnification in case the transaction does not materialize. This would protect them from the losses incurred from carrying out their obligations under the term sheet.

    Apart from the party-led solutions, the courts must also foster a consistent approach when deciding the enforceability of term sheets and other preliminary agreements. The courts should apply a two-tier test to harmonise the conflict between strict textual and contextual interpretations. First, the courts must consider the explicit language in the agreement. If the language designates the agreement as non-binding, a strong presumption against enforceability must be taken. Second, for this presumption to be rebutted, the party seeking enforceability must demonstrate that the parties’ subsequent conduct is overwhelmingly significant. Such conduct must show a clear intention to supersede, and mutually waive the non-binding clause and create a final, binding deal.

    Conclusion

    The Delhi High Court’s judgement affirms that term sheets, unless categorically stated to be binding, serve as instruments of intent that do not create binding legal obligations. Although conduct like transfer of assets and data sharing may indicate commercial intention of the parties, it does not result in creation of enforceable rights. For commercial intention to attain legal finality, terms of the contract must be express and not implied. This underscores the importance of clear and precise drafting of preliminary agreements where language disclaiming enforceability should be explicit and reiterated throughout. The Delhi HC’s verdict is a key reference point for contractual interpretation of not just term sheets, but all preliminary agreements in commercial disputes. This case also serves valuable lessons to buyers and sellers in drafting term sheets while entering into corporate transactions.

  • Misplaced Reliance on CPC in Arbitration: From the lens of Ravi Ranjan Developers vs Aditya Kumar Chatterjee

    Misplaced Reliance on CPC in Arbitration: From the lens of Ravi Ranjan Developers vs Aditya Kumar Chatterjee

    BY SHOUBHIT DAFTAUR AND AROHI MALPANI, THIRD – YEAR STUDENT AT MNLU, MUMBAI

    INTRODUCTION

    The interplay between domestic arbitration and the Code of Civil Procedure, 1908 (‘CPC’) has long been fraught with tension. While certain CPC principles, such as the doctrine of res judicata under Section 11, have constructively contributed to arbitral practice by ensuring finality in dispute resolution, the indiscriminate imposition of procedural rules designed for civil litigation into arbitration has often been erroneous and misplaced. Arbitration, by its very design, prioritises party autonomy, procedural flexibility, and efficiency, and these objectives are frequently compromised when courts rely too heavily on civil procedure doctrines.

    The Supreme Court’s decision in Ravi Ranjan Developers Pvt. Ltd. v. Aditya Kumar Chatterjee (‘Ravi Ranjan’) exemplifies this difficulty. In the case, despite the arbitration agreement specifying Kolkata as the seat, the Respondent approached the Muzaffarpur District Court post-termination and later filed a petition under Section 11 before the Calcutta High Court. Ravi Ranjan Developers challenged the Court’s jurisdiction, citing a lack of cause of action, while the Respondent argued jurisdiction based on the arbitration clause. However, the Supreme Court problematically held that an arbitration agreement cannot confer jurisdiction on a court that inherently lacks it, applying a principle rooted in the CPC that negates autonomy and efficiency.

    This reasoning represents a significant departure from India’s recent pro-arbitration jurisprudence. Importing CPC-based jurisdictional tests into arbitration alters the centrality of party autonomy and threatens to dilute the efficiency and autonomy that arbitration seeks to achieve. Against this backdrop, this blog critiques the misplaced reliance that courts often place on CPC in arbitration and advocates for a clearer demarcation between the two frameworks, so as to preserve the foundations on which the arbitral process rests.

    THE RAVI RANJAN DEVELOPERS JUDGEMENT: A DEPARTURE FROM EFFICIENCY AND AUTONOMY

    The division bench in Ravi Ranjan Developers held that an arbitration agreement cannot confer jurisdiction upon a court that inherently lacks it. The crux of the controversy lies in the fact that this interpretation departs from the Supreme Court’s precedents as well as party autonomy and procedural efficiency, the pillars of arbitration. Party autonomy permits parties to designate either the seat or the venue of arbitration. In the BALCO case, the Supreme Court held that the term subject-matter of the arbitration under Section 2(1)(e) of the Act refers to the juridical seat, not the location of the cause of action or subject-matter of the suit. Once a seat is chosen under Section 20, the courts at that seat alone have supervisory jurisdiction. The Court has further ruled that parties may select a neutral seat of arbitration, and that a narrow construction of Section 20 would render this autonomy nugatory.    

    Building on this principle, BGS SOMA JV v. NHPC (Ltd..) clarified that when a venue is expressly designated and the arbitration proceedings are anchored to it, with no contrary indications,      it must be treated as the juridical seat. Applying this, the reference to Kolkata satisfies all conditions, making it the legal seat and conferring exclusive jurisdiction on its courts. Despite this clarity, the court erred in concluding that an agreement cannot confer jurisdiction on a place that otherwise lacks it, overlooking that such autonomy is not only consistent in the judicial precedents, but also it forms a statutory right.

    Fair, speedy, and inexpensive resolution is the essence of arbitration, but in Ravi Ranjan Developers, the Supreme Court undermined this principle by disregarding the parties’ express choice of Kolkata as the juridical seat. By reverting to a cause-of-action-based analysis under the CPC, the Court imposed delay, expense, and uncertainty, eroding the efficiency and autonomy that arbitration is meant to safeguard. This reasoning marks a troubling departure from India’s pro-arbitration jurisprudence, threatening to dilute party autonomy, compromise finality, and undo the progress made in fostering arbitration as an alternative to litigation

    MISPLACED RELIANCE ON THE CODE OF CIVIL PROCEDURE

    The Statement of Objects and Reasons of the Arbitration and Conciliation Bill, 1995, makes it clear that the Act was intended to comprehensively govern arbitration, reduce court interference, and simplify the enforcement of arbitral awards. This intention is further firmly set out in Section 5 of the Act. The meaning of this provision is straightforward- laws like the CPC, are not meant to apply to arbitration proceedings unless the Act itself refers to them. The Act is a complete and self-sustained code, and any procedure to be followed must arise from the Act itself rather than external sources.

    Indian courts have on several occasions supported this understanding. One such instance was the Court’s ruling in Essar House Pvt. Ltd. v. Arcellor Mittal Nippon Steel India Ltd. (‘     Essar’     ). The Supreme Court held that while courts must keep in mind the basic principles of CPC, they are not bound to apply every procedural requirement strictly when deciding an application for interim relief under Section 9 of the Act. The Court, therefore, clarified that procedural technicalities under the CPC should not prevent courts from doing justice, upholding the separation between CPC rules and dispute resolution via arbitration.

    However, Sanghi Industries Ltd. v. Ravin Cables Ltd. appears to narrow the scope of the court’s powers under Section 9 by requiring that the conditions under Order XXXVIII Rule 5 of CPC be met before interim relief can be granted. This decision seems to go against the broader and more flexible interpretation adopted in Essar, and arguably compromises the independent and self-contained nature of the Act by drawing it back to the procedural framework of CPC.

    A similar borrowing can be seen in the debate around impleadment. The power to implead parties stems from Order I Rule 10 of the CPC. While this principle is well established in civil and commercial disputes, its extension into arbitration through reliance on the Group of Companies doctrine in Cox and Kings II in the absence of a clear statutory provision raises concerns. Particularly criticised for weakening the consensual foundation of arbitration by substituting implied consent for the express consent mandated under Section 7 of the Act, this inclusion has nonetheless found some support. What is clear, however, is that a procedural device rooted in the CPC has been read into a framework intended to be autonomous and self-contained. It is against this background of contested application and creeping CPC influence that the reasoning in Ravi Ranjan Developers must be understood.

    Parties cannot be compelled to enter arbitration, and by the same logic, cannot be made to follow procedural laws they did not agree to. In Afcons Infrastructure Ltd. v. Cherian Varkey Construction Co. (P) Ltd., the C     ourt held that parties must give their consent before being referred to arbitration under Section 89 of CPC. A clear example of non-application of CPC principles in practice can be found in Emkay Global Financial Services Ltd. v. Girdhar Sondhi, where the Supreme Court reaffirmed that, unlike CPC, arbitration treats the concept of seat as central. It held that the seat chosen by the parties acts as a neutral location for the arbitration, and even if no part of the cause of action arises there, the seat alone confers exclusive jurisdiction on the courts of that place to oversee the arbitral process. This position affirms that once the seat is determined, for instance, Mumbai, the Mumbai courts alone have the authority to regulate the proceedings arising from that agreement, regardless of any connection to the cause of action. Thus, this clarity leaves no room for importing jurisdictional doctrines from the CPC and places the control of arbitration squarely in the hands of the parties. 

    As established, the Court in Ravi Ranjan Developers runs counter to the legislative scheme of the Act, eroding the core tenets that distinguish arbitration from traditional litigation. If India is to affirm its commitment to an arbitration-friendly regime, it must resist the temptation to fall back on outdated procedural frameworks. Upholding party autonomy and ensuring the non-applicability of CPC-based tests is not merely desirable; it is essential.

    CONCLUSION AND WAY FORWARD: THE PATH TO A TRULY PRO-ARBITRATION INDIA

    Party autonomy and procedural efficiency in international arbitration are not loose ideals but have been firmly established in the UNCITRAL Model Law and widely followed in both common law and civil law countries. Leading arbitral institutions such as the International Chamber of Commerce and London Court of International Arbitration structure their procedural frameworks around these principles, enabling parties to shape proceedings on their terms while ensuring the expeditious resolution of disputes. This reflects a trend across many arbitration-friendly countries that value clarity in commercial disputes, which is diluted by antithetical reliance on CPC principles. If India wants to be seen as a reliable arbitration hub, these principles cannot be selectively applied. 

    The Supreme Court’s reasoning in Ravi Ranjan brings forth the perils of conflating arbitration with civil procedure. The CPC has been designed to regulate adversarial litigation in courts and is inherently different to arbitration. Importing CPC principles in arbitration dilutes the very principles that make arbitration a preferred method for dispute resolution. When courts superimpose civil procedural frameworks upon arbitral proceedings, they risk collapsing arbitration back into the litigation model it was intended to replace. India has made serious efforts to promote itself as a pro-arbitration jurisdiction. Landmark rulings like BALCO and BGS SOMA JV v. NHPC Ltd. have moved the law closer to international norms. However, when judgments like Ravi Ranjan Developers are passed, it slows down progress and creates confusion.

    The takeaway is clear- for India to maintain credibility as a pro-arbitration regime, the judiciary must resist the tendency to borrow from the CPC, and instead reaffirm arbitration as a distinct legal framework governed by its own statute and international principles. Only by safeguarding this separation can India strengthen its arbitration ecosystem and align itself with global best practices. By reviving a cause-of-action test rooted in the CPC, the Supreme Court in Ravi Ranjan Developers didn’t just misread party autonomy, it set Indian arbitration back by reinforcing judicial overreach over consensual dispute resolution. Unless courts resist the temptation to read CPC into arbitration, India risks reducing arbitration to nothing more than litigation in disguise.

  • Fixing What’s Final? The Gayatri Balasamy Dilemma

    Fixing What’s Final? The Gayatri Balasamy Dilemma

    BY Arnav Kaushik and Saloni Kaushik, THIRD and FIFTH- YEAR studentS AT Dr. Ram Manohar Lohiya National Law University, Lucknow And MahArashtra NaTIONAL LAW UNIVERSITY, NagPUR

    INTRODUCTION

    On 30 April 2025, in Gayatri Balasamy v. ISG Novasoft Technologies Ltd. (‘Gayatri Balasamy’), a Constitution Bench of the Hon’ble Supreme Court by a 4:1 majority, held that courts possess a limited power to modify arbitral awards. This power was interpreted as falling within courts’ express powers under Section 34 of the Arbitration and Conciliation Act, 1996 (‘1996 Act’). The judgment departs from Project Director, National Highway v. M. Hakeem (‘M. Hakeem’), where such powers were expressly denied. The Court identified three limited circumstances permitting modification: (1) severance of invalid portions of award, (2) alteration of post-award interest, and (3) correction of inadvertent errors or manifest errors. Justice Vishwanathan dissented, arguing that modification cannot be read into Section 34, except to rectify inadvertent errors. While the majority sought to resolve a legal impasse, it arguably introduced new interpretative ambiguities.

    PARTY AUTONOMY AND JUDICIAL NON-INTERVENTION

    To discern the implications of this ruling, one must consider the foundational principles of arbitration law—party autonomy and minimal judicial intervention. The 1996 Act, modelled on the UNCITRAL Model Law (‘Model Law’), enshrines these core principles. Party autonomy, the grundnorm of arbitration, allows parties procedural freedom, as contemplated in Article 19(1) of the Model Law and Section 19(2) of the 1996 Act.  Complementing party autonomy, the Model Law’s non-interventionist approach is adopted by the 1996 Act, emphasizing minimal judicial interference and finality of awards. The Statement of Objects and Reasons of the 1996 Act clearly reveals the legislative intent to limit courts’ intervention, with sub-point (v) of Point 4 expressly aiming to minimize courts’ supervisory role. Section 5’s non obstante clause confines the scope of judicial intervention to matters governed by Part I of the 1996 Act, while Section 35 ensures finality of awards, highlighting the legislative intent of minimal judicial interference.

    NO POWER TO MODIFY ARBITRAL AWARD?

    There is no express provision in the 1996 Act, which recognizes the power to modify or vary arbitral award. The majority in Gayatri Balasamy invoked the maxim omne majus continet in se minus, arguing that the bigger power to set aside an arbitral award inherently subsumes the lesser power to modify. In contrast the minority, relying on Shamnsaheb M. Multtani v. State of Karnataka, argued that this maxim, rooted in criminal law, applies only when two offences are ‘cognate’— sharing common essential elements. Since modification and setting aside differ fundamentally in their legal consequence, the former results in alteration whereas the latter leads to annulment, therefore, the power to modify cannot be subsumed within power to set aside. Nonetheless, the application of this maxim violates the cardinal rule of statutory interpretation. According to this rule, where the language is unambiguous, it must be given plain and ordinary meaning. Notably, the majority held that Section 34 does not restrict the range of ‘reliefs’ the court can grant.  However, in our opinion, the plain text of Section 34 limits the recourse to ‘only’ setting aside an award. This deliberate restriction, supported by expressio unius est exclusio alterius, and upheld in M. Hakeem signifies the legislative intent to exclude other remedies such as modification.  Unlike foreign jurisdictions such as the U.K., U.S.A, and Singapore, and Section 15 of the erstwhile 1940 Act, the 1996 Act does not expressly provide for modification powers. Despite Vishwanathan Committee’s recommendation, the legislature has not evinced any intent to incorporate an express provision, as is evident from the Draft (Amendment) Bill 2024. Therefore, imputing a power of modification would amount to the courts engaging in a merit-based review of the arbitral award, a course of action unauthorized by law.

    MODIFICATION V. SEVERANCE

    As discussed in the preceding section of this blog, the powers to modify and to set aside an award are fundamentally distinct in their legal consequences. This raises the question: can the powers to partially set aside an award, that is to sever certain portions, be equated with the powers to modify? The minority view relies on the definition of “sever as to separate” to justify the power to set aside an arbitral award partly. Section 34(2)(a)(iv) contemplates severance, allowing partial setting aside of an award where the invalid portion is separable, in variability and quantum, to preserve the valid portion. Severance is possible where claims are structurally independent. As held in J.G Engineers Pvt. Ltd. v. Union of India , distinct claims—separate in subject-matter, facts, and obligations can be severed without altering award’s substance. A decision on a particular claim is an independent award in itself, capable of surviving despite invalidity of another claim, as endorsed in NHAI v. Trichy. While power to partial setting aside is recognised, this does not equate to a power to modify. Essentially, severance entails elimination of invalid portions without examining the merits, whereas modification entails a pro-active alteration which may or may not require a merit-based review. Furthermore, the majority view remained silent on a pertinent question: whether modification can fill the gap where severance fails due to structural dependence of claims, as with composite awards? With respect to invalid portions, Section 34 contemplates the initiation of fresh proceedings which re-affirms that severance is not an alternative to setting aside of an award but an ‘exception’ within it.

    BUILT-IN FIXES: SECTION 33 & 34(4) OF 1996 ACT

    Despite express provisions under Section 33, the Supreme Court held that courts may also rectify errors in arbitral awards by invoking inherent powers under Section 151 of the Code of Civil Procedure (CPC’). However, it is our considered view that inherent powers cannot override express statutory provisions, even under the pretext of serving justice. This is because it is presumed that procedure specifically laid down by the legislature, including under Section 34 of 1996 Act, is guided by the notions of justice.

    Both the opinions invoked Section 152 of the CPC, which allows correction of accidental slips in judgments to avoid undue hardship. The minority held that this may apply only where (a) errors were not raised under Section 33; or (b) despite being raised, were not rectified by the arbitral tribunal. The majority, however, broadened this to include “manifest errors” by combining Section 152, the power to recall, and the doctrine of implied powers. Yet, term “manifest errors”lack clear scope: does it refer only to inadvertent errors under Section 33(1)(a), or also to curable procedural defects? We draw a distinction here: inadvertent errors are unintentional and apparent, while curable defects involve procedural irregularities affecting the award’s integrity, such as lack of reasoning, or inadequate award interest. Addressing such defects require discretion, and rightly falls squarely within tribunal’s authority under Section 33. Interestingly, the majority itself conceded that remand, unlike modification, enables tribunal to take corrective measures such as recording additional evidence. This position was further reinforced by the majority’s holding that where any doubt arises as to the propriety of a correction, the appropriate course is to remand the award to the tribunal under Section 34(4). This aligns with judicial pronouncements in I-Pay Clearing Services (P) Ltd. v. ICICI Bank Ltd. and Dyna Technologies Private Ltd. v. Crompton Greaves Ltd., which clarified that courts ought to provide the tribunal an opportunity to rectify curable defects.  Moreover, Sections 33(2) and (3) explicitly empower the tribunal to evaluate whether correction requests are justified, reaffirming its authority over its procedural irregularities. In our view, curable procedural defects, such as post-award interest, should mandatorily be remanded to the tribunal, while courts may independently rectify inadvertent, clerical errors, under Section 152, CPC.

    JUDICIAL OVERREACH AND ARTICLE 142

    The minority view, while referring to the Supreme Court Bar Association v. Union of India and Shilpa Sailesh v. Sreenivasan (‘Shilpa Sailesh’), emphasized that Article 142 should not be invoked to construct a new legal framework in the absence of express provisions, such as modification powers under Section 34 of 1996 Act. In the case of Union Carbide Corporation v. Union of India, the Supreme Court had enunciated that Article 142, while rooted in equity, must conform to statutory prohibitions, especially those grounded on some fundamental principles of general or specific public policy. Citing interpretation of “specific public policy” in the case of Shilpa Sailesh, the minority held that the powers under Article 142 cannot override non-derogable principles central to a statute— in this context party autonomy and minimal judicial interference. 

     While we agree with the minority, the majority opinion warrants a closer scrutiny. While stating that Article 142 powers should not be invoked to modify awards on merit, the majority simultaneously observed that it may be invoked to end litigation, thereby blurring the scope of intervention. The equitable principles under Article 142, such as patent illegality, notions of morality and justice, and principles of natural justice, are already embedded as grounds for setting aside arbitral awards. Interestingly, the Vishwanathan Committee had recommended insertion of an express proviso allowing courts to make consequential orders varying the award only in exceptional circumstances to meet the ends of justice. However, this recommendation  didn’t materialise, thereby indicating that the legislature intended the mechanism of setting aside an award to serve the purpose of ensuring complete justice.

    CONCLUSION

    The Supreme Court’s ruling in Gayatri Balasamy marks a significant shift in Indian arbitration law by permitting courts limited power to modify arbitral awards. Citing legal maxims like omne majus continet in se minus, and inherent powers, the majority blurred the distinction between setting aside and modifying awards, risking judicial overreach and merit-based review.  The issue of modifying arbitral awards is inherently complex and must be approached with restraint. While courts may justifiably correct inadvertent, clerical errors, given that such corrections do not amount to review on merits, any broader exercise of this power must be checked. The vague and undefined use of the term ‘manifest errors’ creates a troubling lacuna, allowing scope for subjective judicial interpretation. The Apex Court must clarify the contours of what constitutes a ‘manifest error’, otherwise the courts risk exceeding the boundaries of minimal intervention. In the pursuit of doing complete justice, the courts must not undermine the legislative intent of excluding modification as a remedy, particularly when such a change can only be brought through a legislative policy decision. To resolve the present ambiguity, the legislature should reconsider the Vishwanathan Committee’s recommendation and expressly delineate the limited circumstances under which courts may vary an award.  Despite being well-intentioned, the judgment introduces new complexities, necessitating legislative intervention to preserve the delicate balance between finality of awards and fairness of outcomes

  • Bridging Global Standards: India’s Approach To Enforcing Emergency Arbitrator Orders

    Bridging Global Standards: India’s Approach To Enforcing Emergency Arbitrator Orders

    Ishita kashyap and Vinayak RajaK, Fourth and Fifth Year students, NATIONAL LAW UNIVERSITY DELHI, NEW Delhi

    INTRODUCTION

    Emergency arbitration (‘EA’) is an evolving concept in the world of arbitration. It seeks to provide a speedy mechanism for disposal of interim relief applications made by the parties in arbitration before the tribunal is formed. It has been recognised by many international institutional rules such as Singapore International Arbitration Centre (‘SIAC’) and International Commercial Arbitration. There was an ambiguity on the legal question of enforceability of the ‘award’ given by such a method of arbitration. The Supreme Court of India, in the judgment of Amazon v Future, resolved this ambiguity and held the enforceability of such emergency arbitral ‘award’ under Section 17(1) of the Arbitration and Conciliation Act, 1996 (‘Arbitration Act’) valid in the cases of Indian-seated arbitration. This article provides the backdrop of the judgment and the recent Draft amendment of 2024 of the Arbitration and Conciliation Act,1996 (‘draft amendments’), and further analyses its legal implications on the arbitration landscape of India.

    JUDICIAL PRONOUNCEMENTS

    The legal standing of emergency orders in India was uncertain before the landmark judgment in the Amazon-Future case. The Delhi High Court, in Raffles Design v Educomp, determined that an emergency arbitrator’s order is unenforceable under Section 17 of the Act in foreign-seated arbitration, hence necessitating recourse under Section 9 of the Act for such arbitrations. Therefore, this case did not weaken emergency arbitration awards but rather focused only on foreign-seated arbitrations.

    Subsequently, the Delhi High Court in Ashwani Minda v. U-Shin denied the relief to the parties under Section 9, reasoning that the parties had excluded Part I of the Act, and the emergency arbitrator had already rejected the request, thereby the Doctrine of Election coming into play to bar the parties from switching forums. The Bombay High Court in Plus Holdings v. Xeitgeist granted interim relief to the parties under Section 9 despite an EA being appointed under SIAC rules because it explicitly allowed for court intervention.
    While neither case turned solely on Section 9(3), the two judgments showed the divergent judicial attitudes for court intervention when emergency arbitration has already been invoked. This judicial ambiguity around emergency arbitration enforcement in India was ultimately clarified in the Amazon-Future decision.

    AMAZON V. FUTURE RETAIL

    The Amazon–Future dispute originated when Amazon NV Investment Holdings LLC initiated arbitration proceedings against Future Retail Ltd. before the SIAC. In the course of these proceedings, Future moved to transfer its retail assets to a third party, which Amazon claimed was violative of pre-existing contractual arrangements. Amazon obtained interim relief from the emergency arbitrator, prohibiting Future from proceeding with this transaction. It sought to enforce this award in India under Section 17(2) of the 1996 Act.

    On 6th August 2021, the Supreme Court held that the Arbitration Act does not preclude parties from adopting procedural rules that allow an emergency arbitrator to grant interim relief. Since SIAC rules permit this mechanism, the EA award should be held valid and enforceable. The Court emphasised that party autonomy, which is the bedrock principle of arbitration, allows for such institutional rules, and as long as parties have agreed to them, the emergency arbitration must be respected.

    LEGAL ANALYSIS OF THE RULING

    The court answered the legal question of whether an award given by emergency arbitration can be considered as an order under section 17(1) of the Arbitration Act to be enforceable. The court read sections 2(1)(a), (c) and (d) along with sections 2(6) and 2(8) and recognised the party’s authority to determine issues that arise between the parties in any way they prefer. This autonomy was extended under section 2(8) to the selection of institutional rules which would govern the process of arbitration. Similarly, section 19(2) allowed for agreement on procedure to be followed by an arbitral tribunal in future proceedings.

    This reading emphasized the importance of party autonomy in dealing with substantive as well as procedural arrangements of arbitration. Further, section 21 proves that the arbitral proceedings are commenced on a date on which the request for that dispute to be referred to arbitration is received by the respondent. While this provision is expressed as limited by the parties’ consent to any other date, it provides a deemed date for commencement of proceedings before the actual arbitral tribunal is formed.

    The court used the ratio in Bharat Aluminium Co vs Kaiser Aluminium Technical Services and M/S. Centrotrade Minerals and Metals  to reaffirm the significance of party autonomy being the brooding and guiding principle  in arbitration. In this light, when section 2(1)(d) is read, it is to be read in subjection to the phrase “unless context otherwise requires”. The context in cases is provided by institutional rules agreed upon by the parties, which in this case were given by SIAC, which does provide for emergency arbitration.

    THE DRAFT ARBITRATION AND CONCILIATION (AMENDMENT) BILL, 2024

    This draft amendment fills the legal gap which was created by Amazon v. Future. While it judicially recognized orders of emergency arbitrators seated in India, there was no express statutory basis for the same. By bringing “emergency arbitrator” in the definitional clause and creating Section 9A, Parliament would recognize the appointment and functioning of emergency arbitrators in domestic arbitration, bringing the existing implied power under institutional rules now under the statute’s backing.

    The draft explicitly provides that orders of emergency arbitrators are enforceable as if they are tribunal orders under Section 17(2). This fades away the ambiguity about whether courts would treat EA orders as interim measures or final awards, which was an interpretive tension post-Amazon. Now, parties can rely on EA relief being directly enforceable without seeking parallel court injunctions.

    Section 9A(4) and the new Section 17(1)(da) ensure that once the full tribunal is constituted, it can confirm, modify, or vacate the EA’s order. This balances the urgent nature of EA relief with party rights to a full hearing. It mirrors Singapore and Hong Kong’s approach and ensures that provisional relief does not unjustly prejudice parties, once more facts emerge.

    However, a major limitation that persists is that the draft does not address foreign-seated emergency arbitration. There is no mechanism to enforce EA orders made abroad, since Part II, which governs foreign awards, does not extend to interim relief. Part II applies only to final awards under the New York Convention, and therefore, the cross-border parties would still need to apply for interim measures before Indian courts under Section 9 if they need urgent relief within India’s territory. This leaves India behind Singapore and Hong Kong, which allow some cross-border EA enforcement.

    IMPLICATIONS FOR ARBITRATION LAW IN INDIA

    This is a boon for foreign investors and multinational parties who prefer arbitration but need urgent interim relief early on. While high compliance rates with EA awards have been reported globally, having enforceability on record is critical for those situations where compliance fails. It also advances a pro-arbitration policy that the Law Commission and experts have long advocated. The Supreme Court in Amazon v Future used EA orders as a tool “in aid of decongesting the civil courts and affording expeditious interim relief to the parties”.

    The court’s approach may prompt parties to reconsider forum choices. Because only Indian-seated EAs benefit from this enforceability (by virtue of Part I applying), parties to international contracts may increasingly prefer India as the seat when quick interim relief is desired. However, the court’s reasoning is strictly limited to Indian-seated arbitrations. Notably, the Court held that an EA award with a foreign seat is not a “decree” or final award and therefore not enforceable in India under the New York Convention or Section 17(2). Thus, the Amazon v. Future case is raising the question of the enforcement of EA orders with a foreign seat in India—a sector that could potentially require legislative intervention if it is found to be problematic.

    CONCLUSION

    The Amazon v. Future Retail Supreme Court ruling is a crucial step towards harmonising India’s emergency arbitration regime with the values enshrined in United Nations Commission On International Trade Law Model Law (‘Model Law’), while at the same time uncovering subtle tensions. Model Law Articles 7, 9, and 17H converge with each other in consolidating party autonomy, coexistence of interim measures issued by courts and arbitration agreements, and enforcement of interim relief granted by arbitral tribunals. The Court’s judgment is consistent with this principle by treating orders issued under EA as binding interim measures enforceable under Section 17(2) of the Arbitration and Conciliation Act, thereby solidifying India’s pro-arbitration policy. A subtle divergence remains, as unlike the Model Law and SIAC Rules, which equate EA orders to awards, the Supreme Court treats them as provisional and enforceable, subject to modification by the arbitral tribunal.

    This interpretation works reasonably well with Model Law Article 17H, but it causes complications under the New York Convention, which generally authorizes cross-border enforcement of awards. In limiting enforceability to EAs seated in India, the ruling excludes foreign-seated EA orders from the Convention’s ambit, thus exposing a residual lacuna to be refined legislatively in the future.

  • In Dissent Lies the Truth: A Critical Look at the Court’s Power to Modify an Arbitral Award

    In Dissent Lies the Truth: A Critical Look at the Court’s Power to Modify an Arbitral Award

    BY ANMOL TYAGI, THIRD-YEAR STUDENT AT RGNUL, PATIALA.

    INTRODUCTION

    With a 4:1 majority decision in Gayatri Balasamy vs. M/S ISG Novasoft Technologies Ltd. (2025), (‘Balasamy’) the Supreme Court fundamentally altered India’s arbitration landscape by recognizing courts’ power to modify arbitral awards under Sections 34 and 37 of the Arbitration and Conciliation Act, 1996 (‘the Act’) to modify an arbitral award. This watershed judgment resolves a decade-long jurisprudential conflict sparked by the Court’s 2021 M. Hakeem ruling, which categorically denied modification powers. By permitting limited judicial corrections from computational errors to compensation adjustments, the majority attempts to balance arbitration’s finality with the practical need for efficient justice. However, Justice K.V. Viswanathan’s dissent warns that this “judicial innovation” risks reviving the very interventionist culture the 1996 Act sought to eradicate. This article, firstly, delves into the controversy and analyses the ratio in its pragmatic context; secondly, it analyses its implications and advocates for how what should have been a unanimous verdict is penned down as a dissenting opinion; and lastly, it tries to explore a way forward.

    THE MAJORITY ON THE POWER TO MODIFY

    The Apex Court, through judicial precedents, proffered minimal judicial intervention in arbitral awards, not extending to correction of errors of fact, reconsideration of costs, or engagement in the review of the arbitral awards.

    For modification of awards, the court held that a modification does not necessarily entail the examination of the merits of the case, thereby allowing limited power of modification within the confines of Section 34 without a merit-based evaluation under certain circumstances including; where severing invalid from the valid, correcting clerical, computational and typographical error, certain post award interest and under Article 142 of the Constitution of India, where it is required and necessary to end litigation.  Progressively, such a decision was held to prevent the hardship of re-filing an arbitration and a manifestation of the objects of the Act.

    To that end, the majority in Balasamy invoked the maxim omne majus continet in se minus (“the greater includes the lesser”) to justify modification as incidental to the power to set aside awards. This reasoning hinges on Section 34(2)(a)(iv), which permits partial annulment if an award exceeds the scope of submission. By framing severability as statutory intent, the Court positioned modification as a natural extension of existing powers rather than a novel judicial innovation.

    For severability of awards, the court held that the greater power to set aside an award under Section 34 also includes the lesser power to sever the invalid portion of an award from the valid portion under Section 34(2)(a)(iv) of the Act, whenever they are legally and practically separable. The court differentiated the power conferred under section 34(4) from the limited power to modify on the ground of flexibility. The court upheld the idea of remittal under Section 34(4) as a remedial mechanism enabling the arbitral tribunal to correct curable defects in the award upon court adjournment. On the other hand, modification involves the court directly changing the award, which is limited and requires certainty.

    ANALYSIS OF THE MAJORITY OPINION

    While the court may have tried to weave the principle of equity and justice without offending the judicial fabric of Section 34 and the legislative intent of the Act, certain shortcomings are still exposed. Justice K.V. Vishwanathan’s dissent helps explore these shortcomings.

    i) Theoretical tensions: Party Autonomy vs. Judicial Paternalism

    Justice K.V. Vishwanathan’s dissent concurs with the idea that the power to modify subsumes the power to set aside under section 34 of the Act is fallacious, since the power to set aside an arbitral award does not inherently include the power to modify it because the two functions serve distinct purposes within the arbitration framework. Similar was the rationale of the court in M. Hakeem. Setting aside an award under Section 34 of the Arbitration and Conciliation Act, 1996, is a corrective measure that allows courts to annul an award if it violates fundamental legal principles, such as public policy or procedural fairness. In contrast, modification implies an active intervention where the court alters the substance of the award, which contradicts the principle of minimal judicial interference in arbitration, as in the Mcdermott International Case.

    The proposition of limited modification of an award in the interest of expeditious dispute resolution may seem attractive at first instance, especially for commercial arbitrations involving public law, where the courts may modify the award to enhance compensation for the land acquisition. However, it points to vital concerns regarding its applicability by the courts in general and arguably, the power of remand under section 34(4), though different from the modification powers, acts as a safety valve and serves a similar purpose as it arrays wide powers upon the arbitral tribunal to modify an arbitral award for an effective enforceability.

    Theoretically, arbitration is a voluntary act of dispute resolution through a third party, different from courts and its legal procedures.  While the judgment provides for modification powers to remove the ‘invalid’ from the ‘valid’ and enforce complete justice under Article 142 of the Constitution, it not only raises concerns as to its applicability and limitation in determining what constitutes ‘invalid’ or complete justice, but also strikes at the core of arbitration. It does so by contradicting the fundamental characteristic and statutory intent of arbitration, i.e., the finality of the award through minimal judicial intervention, as was held in Re: Interplay Between Arbitration Agreements Under the Arbitration and Conciliation Act, 1996, and the Indian Stamp Act, 1899.

    Justice K.V. Viswanathan’s dissent highlights a critical tension: the 1996 Act deliberately omitted modification powers present in its predecessor, the 1940 Arbitration Act. The legislature’s conscious choice to limit courts to setting aside or remitting awards reflects a policy decision to prioritize finality over granular corrections. Noting that the Parliament intentionally omitted the ‘powers to modify’ from the repealed Arbitration Act, 1940, the majority’s interpretation risks judicial overreach by reading into the Act what the Parliament excluded, a point underscored by the dissent’s warning that using Article 142 to modify awards subverts legislative authority.

    To that end, arbitration’s legitimacy stems from its contractual nature. By allowing courts to “improve” awards, Balasamy subtly shifts arbitration from a party-driven process to one subject to judicial paternalism. This contravenes the kompetenz-kompetenz principle, which reserves jurisdictional decisions for tribunals. Notably, the UNCITRAL Model Law emphasizes tribunal autonomy in rectifying awards (Article 33), a responsibility now partially appropriated by Indian courts

    ii. Impact on Arbitral decision making

    The threat of post-hoc judicial adjustments may incentivize arbitrators to over-explain conclusions or avoid innovative remedies. For instance, tribunals awarding compensation in land acquisition cases might default to conservative valuations to pre-empt judicial reduction. Conversely, the power to correct clerical errors (e.g., miscalculated interest rates) could save parties from unnecessary remands.

    iii. Enforcement Challenges

    While the Court envisions modification as a time-saving measure, practical realities suggest otherwise. District courts lacking commercial arbitration expertise may struggle to apply the “severability” test, leading to inconsistent rulings and appeals. The Madras High Court’s conflicting orders in Balasamy (first increasing compensation, then slashing it) illustrate how modification powers can prolong litigation.

    Arguably, with the possibility of modification, the judgment practically creates uncertainty and opens Pandora’s box, thereby exposing every arbitration being challenged under some pretext or other. The effect of the judgment might extend to various PSUs, companies, and individuals opting out of arbitration, fearing the non-finality of the award.

    The majority’s reliance on Article 142 to justify modifications creates a constitutional paradox.

    While the provision gives the Supreme Court the power to do “complete justice,” applying it to an arbitral mechanism of private dispute settlement blurs the line between public law exceptionalism and the enforcement of private contracts, which arguably would render Article 142 a “universal fix” for disenchanted arbitral awards.

    For land acquisition cases and corporate disputes both, this poses a paradox: courts acquire efficiency tools at the risk of sacrificing arbitration’s fundamental promise of expert-driven finality. As Justice Viswanathan warns, the distinction between “severance” and appellate review remains precariously thin. With ₹1.3 trillion in ongoing arbitrations at stake, Balasamy’s real test lies in whether lower courts use this power with the “great caution” prescribed inadvertently to revive India’s reputation for boundless arbitration litigation

    COMPARITIVE INTERNATIONAL PERSPECTIVES

    Leading arbitration hubs strictly reserve judicial modification. Singapore’s International Arbitration Act only allows setting aside on grounds of procedure and not on a substantive basis. The UK Arbitration Act 1996 can correct only clerical errors or clarifications (Section 57), whereas Hong Kong’s 2024 rules authorize tribunals-not courts-to correct awards. India’s new “limited modification” system varies by allowing courts to modify compensation values and interest rates, which amounts to re-introducing appellate-style review.

    The UNCITRAL Model Law that influenced the Act limits courts to setting aside awards (Article 34). More than 30 Model Law jurisdictions, such as Germany and Canada, allow modifications by way of tailormade legislative provisions. The Balasamy judgment establishes a hybrid model where there is judicial modification without an express statutory authority, raising concerns in enforcement under the New York Convention. As Gary Born observes, effective jurisdictions identify procedural predictability as a core value threatened by unfettered judicial discretion.

    THE WAY FORWARD: ENSURING EQUILIBRIUM

    The decision permitting limited alteration of the arbitral award represents a paradigm shift in the jurisprudence. The decision demonstrates a genuine effort to balance efficiency with fairness. However, its success depends on responsible judicial application. In the absence of strict adherence to the “limited circumstances” paradigm, India stands the risk of undermining arbitration’s essential strengths: speed, finality, and autonomy. As Justice Viswanathan warned, the distinction between correction and appellate review remains hair-thin. What is relevant here is how the courts apply the new interpretation to amend arbitral awards. Objectively, the courts have to be careful not to exercise the powers of amendment in exceptional situations to that extent, refraining from any impact on the finality of the arbitral award as well as the faith of the citizenry and other institutions within it.

    To avoid abuse, parliament has to enact modification grounds by amending Section 34, in line with Section 57 of the UK Arbitration Act, specifically allowing for corrections confined to reasons specified, promoting clarity and accountability. The Supreme Court would need to direct guidelines to the lower courts for arbitral award modification only when the errors are patent and indisputable, refrain from re-assessing evidence or re-iterating legal principles, and give preference to remission to tribunals under Section 34(4) where possible.

  • Addressing the Silence: Security for Costs in India’s Arbitration Landscape (Part II)

    Addressing the Silence: Security for Costs in India’s Arbitration Landscape (Part II)

    BY Pranav Gupta and Aashi Sharma Year, RGNUL, Punjab

    Having discussed the concept of Security for Costs and International Precedents of Investment Arbitration, this part will delve into precedents of Commercial Arbitration and potential solution for the security for cost puzzle.

    B. Commercial Arbitration Procedure:

    The UNCITRAL Model Law on International Commercial Arbitration, being a foundational framework, empowers the tribunal to order SfC under Article 17(2)(c), after being amended in 2006. The ambiguous drafting of the provision fell prey to a much-anticipated debate,[i] with critics arguing it fails to clearly address the issue of SfC. It led to a proposal[ii] for amending Article 17(2)(c) by adding words “or securing” after “assets” to signify security of some sort. Despite this, the Model Law continues to influence the rules of major arbitral institutions like the London Court for International Arbitration Rules (“LCIA Rules”) and the Singapore International Arbitration Centre Rules (“SIAC Rules”).

    Article 25.2 under the LCIA rules grants the arbitral tribunal power to order for SfC as mirrored by Article 38(3) of the English Arbitration Act, 1996 which is the governing law of arbitrations seated in England and Wales. In the cases of Fernhill Mining Ltd. and Re Unisoft Group (No. 2), the judges devised a three-pronged test for granting SfC: Firstly, there must be “reasons to believe” that the claimant will be unable to pay the defendant’s costs if unsuccessful in the claim. Secondly, there must be a balancing of the interest[iii] of the defendant and the claimant by protecting the defendant against impecunious claims while not preventing the claimant from proceeding with a meritorious claim. Thirdly, the conduct of the party[iv] seeking a SfC must not suggest an attempt to stifle a meritorious claim.

    Rule 48 of the SIAC Rules 2025 empowers the arbitral tribunal to order for SfC. Notably, both the LCIA and SIAC Rules distinguishes between SfC and ‘security for the amount in dispute’, with LCIA Article 25.1(i) and Article 25.2 addressing each separately, in the similar way as SIAC Rule 48 and 49 do.

    A Possible Solution to the Security for Costs Puzzle

    As the authors earlier observed that The Arbitration Act doesn’t possess any express provision for awarding SfC, leading courts to resort to section 9 of The Act, an approach later debunked by the Delhi High Court. However, this contentious issue gained prominence again with the landmark judgement of Tomorrow Sales Agency. The case remains landmark, being the first Indian case to expressly deal with the issue of SfC, with the earlier cases touching the issue only in civil or implied contexts. The case led to the conclusion that SfC couldn’t be ordered against a third-party funder, who is not impleaded as a party to the present arbitration, though the Single Judge Bench upholding the court’s power to grant such a relief under Section 9. However, the judgment leaves ambiguity regarding the particular sub-clause under which SfC may be granted, which the author tries to address by providing a two-prong solution.

    As an ad-hoc solution, the authors prescribe the usage of sub-clause (e) of section 9(1)(ii) of The Arbitration Act, which provides the power to grant any ‘other interim measure of protection as may appear to the court to be just and convenient’. The above usage would be consistent with firstly with the Tomorrow Sales Agency case as it implies the power to order such measure under section 9 of The Act and secondly with the modern interpretation of section 9, where courts emphasised its exercise ex debito justitiae to uphold the efficiency of arbitration.

    As a permanent solution, the authors suggest the addition of an express provision to The Arbitration Act. The same can be added by drawing inspiration from the LCIA Rules and the SIAC Rules’ separate provisions for ‘SfC’ and ‘securing the amount in dispute’, further building on the specifics of the concept laid down in Rule 53 of ICSID Rules, with particular emphasis on the above mentioned Indian precedents. An illustrative draft for the provision adopting the above considerations is provided below:

    • Section XZ: Award of Security for Costs
    • Upon the request of a party, the Arbitral Tribunal may order any other party to provide Security for Costs to the other party.
    • In determining the Security for Costs award, the tribunal shall consider all the relevant circumstances, including:
    • that party’s ability or willingness to comply with an adverse decision on costs;
    • the effect that such an order may have on that party’s ability to pursue its claims or counterclaim;
    • the conduct of the parties;
    • any other consideration which the tribunal considers just and necessary.

    Provided that the tribunal while considering an application for Security for Costs must not prejudge the dispute on the merits.

    • The Tribunal shall consider all evidence adduced in relation to the circumstances in paragraph (2), including the existence of third-party funding.

    Provided that the mere existence of a third-party funding arrangement would not by itself lead to an order for Security for Costs.

    • The Tribunal may at any time modify or revoke its order on Security for Costs, on its own initiative or upon a party’s request.

    Hence, in light of increasing reliance on mechanisms such as TPF, the absence of a dedicated provision for SfC remains a glaring procedural gap. While, the Indian courts have tried to bridge this void through the broad interpretations of section 9 of The Arbitration Act, a coherent solution requires both an ad interim interpretive approach, through the invocation of sub-clause (e) of Section 9(1)(ii) and a long-term legislative amendment explicitly incorporating SfC as a standalone provision. Such a provision must be drawn from international frameworks such as the ICSID, LCIA, and SIAC Rules, ensuring India’s credibility as an arbitration-friendly jurisdiction.


    [i] United Nations Commission on International Trade Law, Report of the Working Group on Arbitration and Conciliation on the work of its forty-seventh session (Vienna, 10-14 September, 2007).

    [ii] ibid.

    [iii] Wendy Miles and Duncan Speller, ‘Security for costs in international arbitration- emerging consensus or continuing difference?’ (The European Arbitration Review, 2007) <https://www.wilmerhale.com/-/media/e50de48e389d4f61b47e13f326e9c954.pdf > accessed 17 June 2025.

    [iv] Sumeet Kachwaha, ‘Interim Relief – Comments on the UNCITRAL Amendments and the Indian Perspective’ (2013) 3 YB on Int’l Arb 155 <https://heinonline-org.rgnul.remotexs.in/HOL/P?h=hein.journals/ybinar3&i=163> accessed 5 June 2025.  

  • Addressing the Silence: Security for Costs in India’s Arbitration Landscape (Part I)

    Addressing the Silence: Security for Costs in India’s Arbitration Landscape (Part I)

    BY PRANAV GUPTA AND AASHI SHARMA, SECOND- YEAR STUDENT AT RGNUL, PUNJAB

    Introduction

    The recent cases of Lava International Ltd. and Tomorrow Sales Agency have reignited the confusions regarding the concept of Security for Costs (‘SfC’) in India.Gary B. Born[i] defines SfC as “an interim measure designed to protect a respondent against the risk of non-payment of a future costs award, particularly where there is reason to doubt the claimant’s ability or willingness to comply with such an award.

    The authors in this manuscript shall wade through the confusions raised in the above cases. For that, firstly, we try to conceptually understand the concept of SfC by distinguishing it from the other situated similar concepts, while also emphasizing on the legal provisions governing them. Secondly, we analyze the concept of SfC in light of the leading international investment and commercial arbitration practices. Lastly, the authors propose a two-tier solution to the problem of SfC in India building on the international practices with certain domestic modifications.

    Security for Costs: Concept and Law
    1. Understanding Security for Costs:

    The concept of SfC is fundamentally different from that of ‘securing the amount in dispute’, as the latter is a measure to ensure the enforceability of the arbitral award by securing the party with whole or some part of the amount claimed or granted. section 9(1)(ii)(b) and section 17(1)(ii)(b) of The Arbitration and Conciliation Act, 1996 (‘The Arbitration Act’) regulates the regime for ‘securing the amount in dispute’ as an interim measure. The Hon’ble Supreme Court in the cases of Arcelor Mittal and Nimbus Communications clarified that section 9 permits securing the ‘amount in dispute’ on a case by case basis. Further, SfC is also distinct from ‘Recovery of Costs’, as ‘costs’ are recovered post the declaration of award and is addressed by section 31A of The Arbitration Act. 

    B. Security for Costs and Section 9: A Legal Void:

    While, The Arbitration Act deals with the similarly situated aspects of SfC as shown above, it remains silent on a provision for SfC, a gap that remains unaddressed even by the 2015 Amendment and The Draft Arbitration and Conciliation (Amendment) Bill, 2024. A landmark ruling with respect to SfC was delivered in the J.S. Ocean Liner case, by ordering to deposit USD 47,952 as an amount for recovery of legal costs. The court relied on section 12(6) of the English Arbitration Act 1950, akin to section 9(1)(ii)(b) of The Arbitration Act, to award SfC as an interim measure in this case. However, this harmonious interpretation was later rejected in the cases of Intertoll Co. and Thar Camps, by observing that under sub-clause (b) of section 9(1)(ii), only ‘amount in dispute’ can be secured and not the SfC. Hence, The Arbitration Act needs a reform with respect to the provision concerning SfC.

    International Precedents concerning Security for Costs
    1. Investment Arbitration Insights:

    The International Centre for Settlement of Investment Disputes (‘ICSID’) Tribunal (‘The Tribunal’), being the world’s primary institution, administers the majority of all the international investment cases. Till the 2022 Amendment to The ICSID Arbitration Rules (‘ICSID Rules’), even ICSID Rules were silent on this concept of SfC, however now Rule 53 of the same Rules contains the express provision for awarding SfC by The Tribunal. As the newly introduced Rule 53 is in its nascent stage with no extensive judicial precedents[ii] on it yet, the authors analyze the cases prior to the 2022 Amendment to understand the mechanism for granting SfC.

    Prior to the 2022 Amendment, SfC was granted as a provisional measure[iii] under Article 47 of The ICSID Convention and Rule 39 of The ICSID Rules as observed in the cases of RSM v. Grenada[iv] and Riverside Coffee.[v] However, in the Ipek[vi] case, the Tribunal permitted the granting of SfC only in ‘exceptional circumstances’.[vii] The high threshold[viii] was reaffirmed in Eskosol v. Italy[ix], where even the bankruptcy didn’t sustain an order for SfC. Further, in EuroGas[x] case, financial difficulty and Third-Party Funding (’TPF’) arrangement were considered as common practices, unable to meet the threshold of ‘exceptional circumstances’.

    Finally, in the RSM v. Saint Lucia[xi] case, the high threshold[xii] was met as the Claimant was ordered to pay US$ 750,000 as SfC on account of its proven history of non-compliance along with the financial constraints, and TPF involvement. In the same case, The Tribunal established a three-prong test[xiii] for awarding SfC emphasizing on the principles of ‘Exceptional Circumstances, Necessity, and Urgency’,[xiv] with the same being followed in the further cases of Dirk Herzig[xv] and Garcia Armas.[xvi] Further, The Tribunal added a fourth criterion of ‘Proportionality’[xvii] to the above three-prong test in the landmark case of Kazmin v. Latvia.[xviii]

    The Permanent Court of Arbitration (“PCA”) is another prominent institution, with nearly half its cases involving Investment-State arbitrations. The PCA resorts to Article 26 of the UNCITRAL Arbitration Rules to award SfC as seen in the Nord Stream 2 case.[xix] In Tennant Energy v. Canada[xx] and South American Silver,[xxi] the PCA applied the same test, devised in the Armas case to grant SfC.[xxii] Similar approaches have been adopted by the local tribunals, including Swiss Federal Tribunal and Lebanese Arbitration Center.[xxiii]


    [i] Gary B. Born, International Commercial Arbitration (3rd edn, Kluwer Law International 2021); See also Maria Clara Ayres Hernandes, ‘Security for Costs in The ICSID System: The Schrödinger’s Cat of Investment Treaty Arbitration’ (Uppsala Universitet, 2019) <https://uu.diva-portal.org/smash/get/diva2:1321675/FULLTEXT01.pdf&gt; accessed 17 June 2025.

    [ii] International Centre for Settlement of Investment Disputes, The First Year of Practice Under the ICSID 2022 Rules (30 June 2023).

    [iii] Lighthouse Corporation Pty Ltd and Lighthouse Corporation Ltd, IBC v. Democratic Republic of Timor-Leste, ICSID Case No. ARB/15/2, Procedural Order No. 2 (Decision on Respondent’s Application for Provisional Measures) (13 February 2016) para 53.

    [iv] Rachel S. Grynberg, Stephen M. Grynberg, Miriam Z. Grynberg and RSM Production Corporation v. Grenada, ICSID Case No. ARB/10/6, Tribunal’s Decision on Respondent’s Application for Security for Costs (14 October 2010) para 5.16.

    [v] Riverside Coffee, LLC v. Republic of Nicaragua, ICSID Case No. ARB/21/16, Procedural Order No. 7 (Decision on the Respondent’s Application for Security for Costs) (20 December 2023) para 63.

    [vi] Ipek Investment Limited v. Republic of Turkey, ICSID Case No. ARB/18/18, Procedural Order No. 7 (Respondent’s Application for Security for Costs) (14 October 2019) para 8.

    [vii] BSG Resources Limited (in administration), BSG Resources (Guinea) Limited and BSG Resources (Guinea) SÀRL v. Republic of Guinea (I),ICSID Case No. ARB/14/22, Procedural Order No. 3 (Respondent’s Request for Provisional Measures) (25 November 2015) para 46.

    [viii] Lao Holdings N.V. v. Lao People’s Democratic Republic (I), ICSID Case No. ARB(AF)/12/6, Award (6 August 2019) para 78.

    [ix] Eskosol S.p.A. in liquidazione v. Italian Republic, ICSID Case No. ARB/15/50, Procedural Order No. 3 Decision on Respondent’s Request for Provisional Measures (12 April 2017) para 23.

    [x] EuroGas Inc. and Belmont Resources Inc. v. Slovak Republic, ICSID Case No. ARB/14/14, Procedural Order No. 3 (Decision on the Parties’ Request for Provisional Measures) (23 June 2015) para 123.

    [xi] RSM Production Corporation v. Saint Lucia, ICSID Case No. ARB/12/10, Decision on Saint Lucia’s Request for Security for Costs (13 August 2014) para 75.

    [xii] Transglobal Green Energy, LLC and Transglobal Green Panama, S.A. v. Republic of Panama, ICSID Case No. ARB/13/28, Decision on the Respondent’s Request for Provisional Measures Relating to Security for Costs (21 January 2016) para 7.

    [xiii] Libananco Holdings Co. Limited v. Republic of Turkey, ICSID Case No. ARB/06/8, Decision on Applicant’s Request for Provisional Measures (7 May 2012) para 13.

    [xiv] BSG Resources Limited (n vii) para 21.

    [xv] Dirk Herzig as Insolvency Administrator over the Assets of Unionmatex Industrieanlagen GmbH v. Turkmenistan, ICSID Case No. ARB/18/35, Decision on the Respondent’s Request for Security for Costs and the Claimant’s Request for Security for Claim (27 January 2020) para 20.

    [xvi] Domingo García Armas, Manuel García Armas, Pedro García Armas and others v. Bolivarian Republic of Venezuela, PCA Case No. 2016-08, Procedural Order No. 9 Decision on the Respondent’s Request for Provisional Measures (20 June 2018) para 27.

    [xvii] Transglobal Green Energy (n xii) para 29.

    [xviii] Eugene Kazmin v. Republic of Latvia, ICSID Case No. ARB/17/5, Procedural Order No. 6 (Decision on the Respondent’s Application for Security for Costs) (13 August 2020) para 24.

    [xix] Nord Stream 2 AG v. European Union, PCA Case No. 2020-07, Procedural Order No. 11 (14 July 2023) para 91.

    [xx] Tennant Energy, LLC v. Government of Canada, PCA Case No. 2018-54, Procedural Order No. 4 (Interim Measures) (27 February 2020) para 58.

    [xxi] South American Silver Limited v. The Plurinational State of Bolivia, PCA Case No. 2013-15, Procedural Order No. 10 (Security for Costs) (11 January 2016) para 59.

    [xxii] Domingo García Armas (n xvi).

    [xxiii] Claimant(s) v. Respondent(s) ICC Case No. 15218 of 2008.

  • Section 12A of Commercial Courts Act : Resolving Territorial Ambiguity in Pre-litigation Mediation

    Section 12A of Commercial Courts Act : Resolving Territorial Ambiguity in Pre-litigation Mediation

    BY ARNAV ROY, THIRD YEAR STUDENT AT Nlu, DELHI
    INTRODUCTION

    The Commercial Courts Act, 2015 was enacted to expedite the resolution of commercial disputes and establish India as an investor-friendly jurisdiction. Among its significant provisions is section 12A, which mandates compulsory pre-institution mediation for commercial disputes unless urgent interim relief is sought. However, section 12A presents an ambiguity regarding territorial jurisdiction, specifically whether mediation must occur within the territorial limits where the subsequent suit is filed. This paper aims firstly to explore the statutory interpretation of section 12A, secondly to discuss judicial clarifications on territorial jurisdiction with specific reference to Ganga Taro Vazirani v. Deepak Rahej, and finally to critically analyse whether substantial compliance suffices to resolve territorial ambiguities.

    UNDERSTANDING SECTION 12A OF THE COMMERCIAL COURTS ACT

    Section 12A requires plaintiffs to exhaust pre-institution mediation, except in urgent interim relief cases. The legislative intent is to promote amicable settlement, reducing judicial burden and enhancing procedural efficiency.

    However, the absence of explicit territorial jurisdiction provisions under section 12A creates ambiguity. Unlike the Civil Procedure Code, 1908, which clearly defines territorial jurisdiction[i], section 12A of the Commercial Courts Act remains silent on this aspect, raising procedural uncertainties.

    MANDATORY NATURE OF PRE-LITIGATION MEDIATION

    Indian courts have reaffirmed the mandatory nature of pre-institution mediation. In Patil Automation (P) Ltd v. Rakheja Engineers, the Supreme Court categorically established the procedural mandatory character of section 12A. Likewise, in Ganga Taro Vazirani v. Deepak Raheja, the Bombay High Court emphasized the necessity for efficient dispute resolution and judicial backlog reduction, underlining the importance of pre-litigation mediation.

    CLARIFYING TERRITORIAL AMBIGUITY: GANGA TARO VAZIRANI JUDGMENT

    The Bombay High Court’s decision in Ganga Taro Vazirani v Deepak Raheja provides crucial guidance on the territorial scope of section 12A’s pre-litigation mediation requirement. In that case, a commercial suit was filed without any urgent relief, raising the question of whether mediation had to occur within the same jurisdiction as the suit. A single judge of the High Court treated section 12A as a procedural provision subject to the doctrine of substantial compliance, rather than an inflexible jurisdictional mandate.

    The court noted that when parties had already made genuine attempts to resolve their dispute, it would be “futile to compel the parties to engage in pre-institution mediation again, merely to satisfy territorial compliance. Such an interpretation would defeat the very purpose for which the Commercial Courts Act, 2015 was brought into force.”  This purposive reading underscored that the objective of section 12A – expeditious settlement of disputes – should not be thwarted by rigid insistence on where the mediation is conducted.

    Substantial compliance over technicality: The High Court emphasized that conducting pre-suit mediation in good faith, even if outside the territorial limits of the court where the suit is later filed, could constitute substantial compliance with section 12A’s mandate. In other words, a bona fide mediation attempt (for example, in a different city or through a private mediator) satisfies the law’s intent, so long as the effort to settle was genuine. This approach prioritizes substantive justice over procedural form – minor deviations in the location or forum of mediation should not invalidate the proceedings, provided the core requirement (attempting amicable resolution) is met.

    Avoidance of redundancy and waiver: By privileging substantial compliance, the High Court avoided redundant procedural cycles. It would serve no purpose to force parties to re-mediate in the court’s locale if they had already mediated elsewhere with no success. Indeed, the judgment warned that insisting on a second mediation solely for territorial alignment would simply cause delay – an outcome contrary to the Act’s intent of swift dispute resolution2. In Ganga Taro, the plaintiff’s initiation of mediation (albeit not in the suit forum) combined with the defendant’s stance meant the court was satisfied that the spirit of section 12A had been honored. This pragmatic stance ensured that procedural rules serve as a means to justice rather than a trap.

    COMPARATIVE ANALYSIS: INTERNATIONAL APPROACHES TO MANDATORY PRE-LITIGATION ADR AND TERRITORIAL SCOPE

    Jurisdictions worldwide have adopted varied stances on mandatory pre-filing alternative dispute resolution (ADR), with differing implications for territorial jurisdiction. A brief survey of select jurisdictions illustrates how the balance between procedural mandate and territorial constraints is struck elsewhere:

    United Kingdom: In England and Wales, there is no equivalent statutory mandate requiring mediation before a civil commercial suit. Instead, the Civil Procedure Rules (CPR) and court practice encourage ADR through pre-action protocols and cost sanctions. The leading case of Halsey v Milton Keynes General NHS Trust established that courts cannot compel unwilling parties to mediate. Still, unreasonable refusal to even attempt mediation can result in adverse cost consequences. This policy has effectively made ADR a de facto expected step in the litigation process. Notably, because mediation in the UK remains voluntary rather than jurisdictionally required, there is no rigid territorial prescription for where it must occur. Parties are free to choose mediation forums anywhere, or even mediate online, as long as it is reasonable and accessible. Recent developments signal a cautious shift toward targeted mandatory mediation , but these initiatives define the process in a way integrated with the court’s system. In all cases, the emphasis is on the fact of engaging in settlement efforts rather than the physical location. Thus, English practice sidesteps territorial disputes by focusing on compliance in substance – if the parties have reasonably engaged with mediation or other ADR, the courts are satisfied, regardless of where or how the mediation took place. This flexible approach aligns with a broader common-law trend of encouraging mediation through incentives and case management, rather than imposing hard territorial rules.

    United States: In the U.S., the approach to pre-litigation mediation varies widely depending on the jurisdiction and subject matter. There’s no blanket federal rule requiring commercial litigants to mediate before filing a lawsuit. However, many states have their own rules mandating ADR in specific contexts. For example, Florida requires pre-suit mediation for certain disputes involving homeowners’ associations. Under Chapter 720 of the Florida Statutes, an aggrieved party must serve a “Statutory Offer to Participate in Pre-suit Mediation” and go through the process as per court rules. Skipping this step can lead to dismissal or a stay of the case.

    Because these requirements are grounded in state law, the mediation is typically localized—it must happen within the state, often with court-approved mediators. A party can’t simply mediate elsewhere or ignore the process; compliance with state-specific procedures is mandatory, much like India’s section 12A requirement for commercial suits. That said, U.S. courts sometimes show flexibility. If the parties have genuinely attempted an ADR process outlined in their contract, courts may still allow the case to proceed, even if the exact statutory steps weren’t followed.

    At the federal level, while there’s no pre-filing mediation rule, many district courts require mediation or settlement conferences after the suit is filed, usually through local rules tied to Federal Rule of Civil Procedure 16. Overall, the U.S. model is decentralized: mandatory pre-litigation mediation exists in certain pockets, usually tied to state jurisdiction or specific areas of law, and when it does apply, parties must follow the local process to move forward in that state’s courts.

    Singapore: Singapore encourages mediation but does not mandate it before filing commercial suits. Instead, court rules like the Rules of Court 2021 require parties to consider ADR and report efforts to the court. Unreasonable refusal to mediate may lead to cost penalties.

    Being a single-jurisdiction city-state, mediation typically takes place locally, often through the Singapore Mediation Centre or court-linked programs. For cross-border disputes, the Singapore International Commercial Court allows cases to pause for mediation under the Litigation Mediation Litigation protocol, though this is voluntary.

    Mandatory pre-litigation mediation exists in community disputes. Under the 2015 Community Dispute Resolution Act, neighbors must mediate before filing claims, or risk dismissal and penalties. While not compulsory for commercial matters, Singapore’s legal framework supports mediation, reinforced by its adoption of the 2019 Singapore Convention on Mediation.

    Comparative Insight: Internationally, the handling of territorial jurisdiction in mandatory pre-filing mediation regimes tends to follow the underlying nature of the mandate. In jurisdictions like the UK, where mediation is encouraged but not explicitly compelled, territorial jurisdiction questions scarcely arise since parties have the freedom to mediate wherever it makes sense. By contrast, in jurisdictions with formal mandatory mediation requirements, the law usually designates or implies a forum or procedure tied to the court’s territory. The Ganga Taro principle of substantial compliance finds echoes in these systems as well, as courts internationally are inclined to excuse technical lapses if the claimant can demonstrate a sincere attempt at pre-litigation ADR. Ultimately, the comparative lesson is that mandatory pre-litigation mediation, as a growing global trend, must be implemented with an eye on practicality. This may be through flexible interpretation, as seen in India, cost-shifting incentives in the UK, or clear but reasonable procedural preconditions in the US and Singapore. Each model seeks to balance the promotion of settlement with the parties’ right of access to courts, navigating territorial concerns by either formalizing the required forum or, conversely, remaining silent on the forum to allow flexibility.

    CONCLUSION: BALANCING EFFICIENCY AND PROCEDURAL COMPLIANCE

    The judgment in Ganga Taro Vazirani clarifies section 12A’s territorial ambiguity effectively. While promoting efficiency, the ruling balances procedural compliance with practical objectives.

    While section 12A requires pre-litigation mediation, judicial interpretation, notably in Ganga Taro Vazirani v. Deepak Raheja, affirms that mediation conducted outside territorial jurisdiction constitutes substantial compliance. Nevertheless, substantial compliance does not supersede explicit jurisdictional requirements under procedural laws such as the CPC. Mediation outside territorial limits is sufficient for compliance provided it does not conflict with jurisdictional rules. A purposive interpretation balancing procedural adherence with practical efficiency ensures that the legislative intent of expedient dispute resolution is maintained without undermining jurisdictional integrity.

    Requiring repeated mediation merely for territorial compliance would defeat the very purpose of the Commercial Courts Act, which aims to ensure the swift resolution of commercial disputes. As the Bombay High Court rightly observed, procedural provisions should facilitate justice rather than obstruct it.

    Therefore, if mediation has already taken place outside the jurisdiction where the action is pending, it should be deemed proper compliance with section 12A. Insisting on strict territorial compliance would only cause unnecessary delays and frustrate the objectives of the Act.

    Thus, the law must balance procedural compliance with practical efficiency. A purposive interpretation of section 12A aligns with legislative intent, ensuring that commercial disputes are resolved swiftly without being entangled in unnecessary technicalities.


    [i] Civil Procedure Code 1908, ss 15-20.

  • The Boundaries of Judicial Intervention In Arbitration: Navigating Section 34

    The Boundaries of Judicial Intervention In Arbitration: Navigating Section 34

    BY MANAV PAMNANI, THIRD-YEAR STUDENT AT NALSAR UNIVERSITY OF LAW, HYDERABAD

  • Imposing a ‘Duty of Curiosity’ on Parties: Keeping The Parties on Their Feet

    Imposing a ‘Duty of Curiosity’ on Parties: Keeping The Parties on Their Feet

    BY SPARSH SRIVASTAVA, A FOURTH-YEAR STUDENT AT NATIONAL LAW UNIVERSITY, ODISHA